Project

Morro Bay High School

Auto Shop

DESCRIPTION:

The interior of the old Bus Barn was renovated and reconfigured to house the automotive technology programs at Morro Bay High School. The 6,200 square-foot Auto Shop provides ample space for hands-on learning and is designed to function as a commercial automotive repair shop. The space has new interior finishes (floors, walls and ceiling) throughout and brand new equipment including the addition of five lifts, advanced diagnostic systems, powder coating system, and metal fabrication tools that allow students to design, cut, grind, weld, and repair custom parts.

Construction Cost: $180,336